
Similar Posts

July 19 Brings Siding
Wait something’s different here. OMG there’s siding on the house. All the way around.

June 11 Brings HVAC and Pics of Plans Too
There IS a pump in the basement and the floor is mostly dry.

June 28 Rains Bring Mudslide
Rain, rain, go away. Come back when the grading is all completed. The rains DID come and created lots of wash-outs, large and small, all around the property. UGH. Not a pretty picture. Enjoy, and if you are so inclined, check out the full set of pics I grabbed today using this link to Amazon…

June 22 Insulation
Today shows lots of different activities are in progress. The main water supple and drain is being connected to the house. It’s coming in right under my office. The insulation on the exterior walls and the roof is in place. Not surprising, the house is much quieter today. That’s a great thing. The last 12…

July 6 Sidewalk Framing & Kitchen Progress
Wow, I see that the sidewalk has been framed out as I walk up to the house today. We’ll actually be able to walk from the front porch to the driveway now. Wait! What’s this? The front door is open. It’s inviting me in. ACK! The kitchen cabinets are sitting in place. YES! The master…

May 23 – Foundation Gets A Coat
The foundation received its waterproofing coating today. This will keep all that nasty rainwater out of our basement. Fingers crossed.