July 23 Stone Front Emerges Slowly
The mortar is being applied to the front of the house where the stone veneer will be installed.

June 19 Pre-drywall Walk-thru
Today we had the pre-dryall walk -thru with Mike, our Ryan Homes project manager.

June 27 Stuff Is Arriving
Its really cool to see things start to arrive. Not only are the walls getting their initial coats of joint compound, but the garage is full of cabinets, HVAC parts, trim, you name it. We will ignore the flooding around the house for now. Enjoy, and if you are so inclined, check out the full…

June 29 We Have a Porch
We have a font porch. Our own little piece of happiness in Sadsbury Township. I took the time to grab a shot of Carol on the porch and some closeups of the porch framing. I just know I’m going to have to do something that requires me to run new wires or hang something heavy….

May 31 – Floors Poured
We arrived at the property today to find that the concrete floors had been poured in the basement and the garage.

June 11 Brings HVAC and Pics of Plans Too
There IS a pump in the basement and the floor is mostly dry.