Skip to content
Matt Ryan script in Satisfaction font.
  • About
  • ContactExpand
    • Now
Matt Ryan script in Satisfaction font.
  • July 15 Electric On Site
    This New House

    July 15 Electric On Site

    ByEmAre 07/15/201911/26/2021

    As I approach the house today I see a number of things going on. First, I saw that the electric meter was installed on the side of the house as I drove up. That is an important step. Now PECO, our electric and gas supplier, knows we exist. Up to this point, they do not…

    Read More July 15 Electric On SiteContinue

  • July 13 Last Trip Out
    This Old House

    July 13 Last Trip Out

    ByEmAre 07/13/201911/26/2021

    Today I had cleaned the kitchen and removed the last few items from the house.

    Read More July 13 Last Trip OutContinue

  • July 13 More Cabinets Arrive
    This New House

    July 13 More Cabinets Arrive

    ByEmAre 07/13/201911/26/2021

    The kitchen counter tops have been set in place. The are beautiful pieces of black granite. The master bath received its vanity top too. Looking great. The tub found a home in the guest bath, along with the toilet flange. Enjoy, and if you are so inclined, check out the full set of pics I…

    Read More July 13 More Cabinets ArriveContinue

  • This Old House

    July 11 TOH is Empty

    ByEmAre 07/11/201911/26/2021

    My favorite part of the house was the main stairway. I loved to rub my hands over the banister as I walked up or down the stairs.

    Read More July 11 TOH is EmptyContinue

  • Window Views
    This Old House

    Window Views

    ByEmAre 07/11/201911/26/2021

    We had some of the most beautiful views out of our windows in TOH.

    Read More Window ViewsContinue

  • July 6 Sidewalk Framing & Kitchen Progress
    This New House

    July 6 Sidewalk Framing & Kitchen Progress

    ByEmAre 07/06/201911/26/2021

    Wow, I see that the sidewalk has been framed out as I walk up to the house today. We’ll actually be able to walk from the front porch to the driveway now. Wait! What’s this? The front door is open. It’s inviting me in. ACK! The kitchen cabinets are sitting in place. YES! The master…

    Read More July 6 Sidewalk Framing & Kitchen ProgressContinue

  • July 2 Tape, Mudding, and Doors
    This New House

    July 2 Tape, Mudding, and Doors

    ByEmAre 07/02/201911/26/2021

    July is showing lots more progress. We are seeing the dryway being taped everywhere. The doors at on site and standing in the rooms ready to be hung. We love the style of the doors with the large panel at the top. The rains did do it’s thing on the fill around the foundation. I…

    Read More July 2 Tape, Mudding, and DoorsContinue

Page navigation

Previous PagePrevious 1 … 5 6 7 8 9 … 21 Next PageNext

© 2025 Matt Ryan

  • About
  • Contact
    • Now