Skip to content
Matt Ryan script in Satisfaction font.
  • About
  • ContactExpand
    • Now
Matt Ryan script in Satisfaction font.
July 15 Electric On Site
This New House

July 15 Electric On Site

ByEmAre 07/15/201911/26/2021

As I approach the house today I see a number of things going on. First, I saw that the electric meter was installed on the side of the house as I drove up. That is an important step. Now PECO, our electric and gas supplier, knows we exist. Up to this point, they do not…

Read More July 15 Electric On SiteContinue

July 13 Last Trip Out
This Old House

July 13 Last Trip Out

ByEmAre 07/13/201911/26/2021

Today I had cleaned the kitchen and removed the last few items from the house.

Read More July 13 Last Trip OutContinue

July 13 More Cabinets Arrive
This New House

July 13 More Cabinets Arrive

ByEmAre 07/13/201911/26/2021

The kitchen counter tops have been set in place. The are beautiful pieces of black granite. The master bath received its vanity top too. Looking great. The tub found a home in the guest bath, along with the toilet flange. Enjoy, and if you are so inclined, check out the full set of pics I…

Read More July 13 More Cabinets ArriveContinue

This Old House

July 11 TOH is Empty

ByEmAre 07/11/201911/26/2021

My favorite part of the house was the main stairway. I loved to rub my hands over the banister as I walked up or down the stairs.

Read More July 11 TOH is EmptyContinue

Window Views
This Old House

Window Views

ByEmAre 07/11/201911/26/2021

We had some of the most beautiful views out of our windows in TOH.

Read More Window ViewsContinue

July 6 Sidewalk Framing & Kitchen Progress
This New House

July 6 Sidewalk Framing & Kitchen Progress

ByEmAre 07/06/201911/26/2021

Wow, I see that the sidewalk has been framed out as I walk up to the house today. We’ll actually be able to walk from the front porch to the driveway now. Wait! What’s this? The front door is open. It’s inviting me in. ACK! The kitchen cabinets are sitting in place. YES! The master…

Read More July 6 Sidewalk Framing & Kitchen ProgressContinue

July 2 Tape, Mudding, and Doors
This New House

July 2 Tape, Mudding, and Doors

ByEmAre 07/02/201911/26/2021

July is showing lots more progress. We are seeing the dryway being taped everywhere. The doors at on site and standing in the rooms ready to be hung. We love the style of the doors with the large panel at the top. The rains did do it’s thing on the fill around the foundation. I…

Read More July 2 Tape, Mudding, and DoorsContinue

Page navigation

Previous PagePrevious 1 … 5 6 7 8 9 … 21 Next PageNext

© 2025 Matt Ryan

  • About
  • Contact
    • Now