July 15 Electric On Site
ByEmAreAs I approach the house today I see a number of things going on. First, I saw that the electric meter was installed on the side of the house as I drove up. That is an important step. Now PECO, our electric and gas supplier, knows we exist. Up to this point, they do not…
June 15 Framing All Around
ByEmAreIt looks like framing is done everywhere now. Enjoy, and if you are so inclined, check out the full set of pics I grabbed today using this link to Amazon Photos. Share this post: Share on Facebook Share on LinkedIn Share on Email
June 19 Pre-drywall Walk-thru
ByEmAreToday we had the pre-dryall walk -thru with Mike, our Ryan Homes project manager.
July 13 More Cabinets Arrive
ByEmAreThe kitchen counter tops have been set in place. The are beautiful pieces of black granite. The master bath received its vanity top too. Looking great. The tub found a home in the guest bath, along with the toilet flange. Enjoy, and if you are so inclined, check out the full set of pics I…
This Old House is Under Contract
ByEm AreIt happened so fast. After 2 weeks of crazy updates, de-cluttering, repairs, and general freshening, the open house had arrived.
June 27 Stuff Is Arriving
ByEmAreIts really cool to see things start to arrive. Not only are the walls getting their initial coats of joint compound, but the garage is full of cabinets, HVAC parts, trim, you name it. We will ignore the flooding around the house for now. Enjoy, and if you are so inclined, check out the full…