Similar Posts
July 2 Tape, Mudding, and Doors
July is showing lots more progress. We are seeing the dryway being taped everywhere. The doors at on site and standing in the rooms ready to be hung. We love the style of the doors with the large panel at the top. The rains did do it’s thing on the fill around the foundation. I…
July 15 Electric On Site
As I approach the house today I see a number of things going on. First, I saw that the electric meter was installed on the side of the house as I drove up. That is an important step. Now PECO, our electric and gas supplier, knows we exist. Up to this point, they do not…
May 21 – Foundation Shows Itself
King of my castle – the one that Carol and I are building.
July 20 Flooring is spreading
Wait something’s different here. OMG there’s siding on the house. All the way around.
May 25 – Grading Taking Shape
Saturday May 25, Memorial Day weekend, shows a lot of progress. The entire rough grading and back-fill of the property appears to have been completed.
June 25 WALLS
What a surprise today when we arrived at our soon-to-be-new-home and found that there are walls in there! So exciting. Mind you, they are only framing at this point, but you can now see definition of the space. This is really a neat feeling to see this happening. Check out a few pics we grabbed….