![May 31 – Floors Poured](https://mattryan.co/wp-content/uploads/2_106-truman_20190531_basement-floor-1-768x1024.jpg)
May 31 – Floors Poured
We arrived at the property today to find that the concrete floors had been poured in the basement and the garage.
![July 20 Flooring is spreading](https://mattryan.co/wp-content/uploads/106-truman_20190720_104600727-1-768x1024.jpg)
July 20 Flooring is spreading
Wait something’s different here. OMG there’s siding on the house. All the way around.
Not Much To Look At
They began clearing the ground for our new home the week of May 6.
![July 2 Tape, Mudding, and Doors](https://mattryan.co/wp-content/uploads/106-truman_20190702_181513628-1-768x1024.jpg)
July 2 Tape, Mudding, and Doors
July is showing lots more progress. We are seeing the dryway being taped everywhere. The doors at on site and standing in the rooms ready to be hung. We love the style of the doors with the large panel at the top. The rains did do it’s thing on the fill around the foundation. I…
![May 25 – Grading Taking Shape](https://mattryan.co/wp-content/uploads/garage-floor-filled-1-768x1024.jpg)
May 25 – Grading Taking Shape
Saturday May 25, Memorial Day weekend, shows a lot of progress. The entire rough grading and back-fill of the property appears to have been completed.
![May 21 – Foundation Shows Itself](https://mattryan.co/wp-content/uploads/106-truman-in-the-basement-1-768x1024.jpg)
May 21 – Foundation Shows Itself
King of my castle – the one that Carol and I are building.