May 25 – Grading Taking Shape
Saturday May 25, Memorial Day weekend, shows a lot of progress. The entire rough grading and back-fill of the property appears to have been completed.
July 23 Stone Front Emerges Slowly
The mortar is being applied to the front of the house where the stone veneer will be installed.
June 29 We Have a Porch
We have a font porch. Our own little piece of happiness in Sadsbury Township. I took the time to grab a shot of Carol on the porch and some closeups of the porch framing. I just know I’m going to have to do something that requires me to run new wires or hang something heavy….
June 5 – Roofing
The plywood sheeting is covering the roof trusses. It really defines the lines of the house now.
June 28 Rains Bring Mudslide
Rain, rain, go away. Come back when the grading is all completed. The rains DID come and created lots of wash-outs, large and small, all around the property. UGH. Not a pretty picture. Enjoy, and if you are so inclined, check out the full set of pics I grabbed today using this link to Amazon…
June 19 Pre-drywall Walk-thru
Today we had the pre-dryall walk -thru with Mike, our Ryan Homes project manager.