• Skip to main content

Matt Ryan

A journey lugging aspirations and experiences, tools and ideals.

June 22 Insulation

June 22 Insulation

by EmAre · Jun 22, 2019

Today shows lots of different activities are in progress. The main water supple and drain is being connected to the house. It’s coming in right under my office. The insulation on the exterior walls and the roof is in place. Not surprising, the house is much quieter today. That’s a great thing.

The last 12 years we have lived on E Lancaster Ave in Downingtown Boro and listened to the reported 15K vehicles a day drive past the front of our house, less than 16′ from the front door.

The tub has found its place, as has the conduit for the whole house fan. The basement stairs are all framed out.

Excitement builds every day.

106-truman_20190622_150137430
106-truman_20190622_150235328_HDR
106-truman_20190622_150525727
106-truman_20190622_150541118
106-truman_20190622_150815238
106-truman_20190622_150848496
106-truman_20190622_151336853
106-truman_20190622_152006400
106-truman_20190622_152227958_HDR

Enjoy, and if you are so inclined, check out the full set of pics I grabbed today using this link to Amazon Photos.

Share this post:

Share on Twitter Share on Facebook Share on Pinterest Share on LinkedIn Share on Email

Filed Under: This New House Tagged With: Ryno-Net

Thanks for stopping by.
Please come back often, or make it easy on yourself and subscribe to be notified of new stuff.

Privacy Policy
No spam. Promise. Unsubscribe at any time. No worries.

Thank you!

You have successfully joined our subscriber list.

.

Reader Interactions

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.

© 2023 · Matt Ryan · Made with in Chester County, Pa
Powered by the Genesis Framework using a customized by Cap Web Solutions No Sidebar Pro Theme.

  • About
  • Blog
  • Contact
  • Privacy