Similar Posts

May 25 – Grading Taking Shape
Saturday May 25, Memorial Day weekend, shows a lot of progress. The entire rough grading and back-fill of the property appears to have been completed.

July 13 More Cabinets Arrive
The kitchen counter tops have been set in place. The are beautiful pieces of black granite. The master bath received its vanity top too. Looking great. The tub found a home in the guest bath, along with the toilet flange. Enjoy, and if you are so inclined, check out the full set of pics I…

July 6 Sidewalk Framing & Kitchen Progress
Wow, I see that the sidewalk has been framed out as I walk up to the house today. We’ll actually be able to walk from the front porch to the driveway now. Wait! What’s this? The front door is open. It’s inviting me in. ACK! The kitchen cabinets are sitting in place. YES! The master…

June 19 Pre-drywall Walk-thru
Today we had the pre-dryall walk -thru with Mike, our Ryan Homes project manager.

July 23 Stone Front Emerges Slowly
The mortar is being applied to the front of the house where the stone veneer will be installed.

June 8 A Day For Exploring
It was time to explore the framed out rooms in our home. We wandered through the entire place, grabbing pics along the way.