July 2 Tape, Mudding, and Doors
July is showing lots more progress. We are seeing the dryway being taped everywhere. The doors at on site and standing in the rooms ready to be hung. We love the style of the doors with the large panel at the top. The rains did do it’s thing on the fill around the foundation. I…

July 18 Uh-oh, BANG
Almost twenty years I’ve been making left hand turns across traffic into my driveway at TOH. All accident free. Today, as I attempt to turn into the Home@ Suites we call home right now, I get wacked in the passenger side front wheel as I inch out into traffic to see if anything is coming….

July 20 Flooring is spreading
Wait something’s different here. OMG there’s siding on the house. All the way around.

June 22 Insulation
Today shows lots of different activities are in progress. The main water supple and drain is being connected to the house. It’s coming in right under my office. The insulation on the exterior walls and the roof is in place. Not surprising, the house is much quieter today. That’s a great thing. The last 12…

June 19 Pre-drywall Walk-thru
Today we had the pre-dryall walk -thru with Mike, our Ryan Homes project manager.
Not Much To Look At
They began clearing the ground for our new home the week of May 6.